June 23

There has been no activity on the bathroom for the past several weeks (though we did lay down a new hardwood floor in the MasterBedroom and closet). The final item for which the contractor is responsible is the glass shower enclosure, made of glass 0.25-0.3 inches thick. The enclosure is custom made, and there is quite a long lead time: after measuring, it was 2-3 weeks before the enclosure was ready. This is normal, apparently.

Today, the shower stall installers came and installed the glass enclosure. It took them less than half a day.