May 2, 2005

Today the crew did more framing: they finished the left doorway, framed the internal wall between the bathroom and closet, and reframed the right doorway to its correct position.

Now that the internal wall is up, it's easier to see how the space will be partitioned.


Details of the left (bathroom) door:


Our double-hung windows arrived.


I stuck the camera into the former heating vent hole and took a picture of the sewage line below the floor. Is the section of pipe in the lower center actually connected to something?