Go back to MasterBath
April 28, 2005
The crew managed to remove all three windows, and boarded up the holes. They also stripped away the ceiling plaster, walls, and insulation.
|
|
The inside of the hip roof.
An insulator from the old knob-and-tube wiring system.
I didn't realize how massive the window would be. After taping up the panes, I hauled the whole thing (with Roger's help) into the garage. I have no idea what I'm going to do with it. Clyde says it's probably not worth that much.
Go back to MasterBath
